Lng Transfer System. The jft system is a complete plug play lng transfer system that requires no modification of existing assets plus minimal interface with the fsu onshore facilities or existing jetty. This process generally involves the connection of hoses from the source of the fuel to the tanker being fuelled.

This ground breaking technology is the first lng hose transfer system that combines the advantages of klaw flip flap valve technology with controlled closure and the transfer rate benefits of a 10 system. Khobra transfer system key to the success of the khobra transfer system is a tensioner and compensation system that monitors and compensates for vessel motions and changes in draft. Transfer personnel high or low level lng tank pressure alarms cables or other means designed to detect excessive movement between transfer vessels or.
Klaw lng hose transfer systems allow for the effective management of ship to ship lng transfer and the close.
Fru case study klaw lng was the first in the world to design manufacture and operate a bulk lng transfer. The system is moved out to the vessel by a tug where it is connected to the vessel by a vacuum attachment. Lng transfer systems and solutions. Klaw lng has delivered two new lng transfer systems to excelerate energy.